Conner Hall

About Conner
Conner Hall is currently under construction and is expected to be completed by Fall 2022.
Each room will have a bathroom that is shared with an adjacent room. Conner will have a courtyard located in the center of all the rooms. In the courtyard, students can hang out or play outdoor games. In addition, two resident assistants (RA’s) are assigned over the dorm to ensure that the guys are safe and healthy.Â

Dorm Overview
- Female Dorm
- Total Number of Residents: 24
- Number of Floors: 1
- Number of RA's: 2
- Number of Washers: 4
- Year Built: 2022
- Number of Lobbies: 1
- Standard Room
- Semi-Private Bathroom
- Number of Dryers: 4
Hall Amenities
- Air Conditioning
- Heating
- Laundry Facilities
- Nearby Parking
Room Amenities | Per Student
- Bed
- Desk
- Twin XL Mattress
- Desk Chair
- Dresser Drawers
- Closet